0848 |
0859 |
parked up in the gap with notice on windscreen
arrived at Bala in a good time roads were quite
loading was a bit of an art
we had the jockey wheel too high so lowered it right down in the end
we moved the ramp to centre to get the jockey wheel up on deck then moved it back to get the rear wheels up, it was touch and go width wise.
0922 |
0923 |
it didnt look right on the truck but wasnt overweight at all on the axle
max 100kg trailer and boat
pivot point was axle of boat trailer
mast hiegt was only 6ft above the deck so all ok
arrival picture at Aberystwyth the Gap Harbour
0923 |
final picture at Bala , who knows when we will return
1100 |
1100 |
nicely manouvered down the ramp reverse operation , went very well
in its trailer spot very nicely
in its spot now untill the projects are done re mast then it can be launched on at least a 4.5 m tide to G3 mooring
No comments:
Post a Comment