Total Pageviews

Friday, 8 November 2024

08112024 Aber

 well another day at the boat, took all the stays off and spreaders with so they can be redone renewed

took the tabernackle off so that can be repaired renewed

strapped it all back up neat and tidy.

next jobs were inside, with more kit to store inside , first booboo was the cover for the panel behind the cockpit intrument panel. despite measuring it it was too small. nm

next job mount the cam on the sliding hatch , tested and in position the holes were drilled and cables run 

the mifi was temp fixed as was the mmpt controller and a 12v 7ah battery coneccted , it all worked 

i was worried drilling holes for the cam base as they then split the base , something always goes wrong ,

with some no nails to seal and also some butyl tape around the big cable hole 

cables tidied inside , not the final spot as the cabin shelf board didnt go to plan, boom removed and in the car , then set about connecting the 12v for the nasa target stuff, a few more bits needed so thats next time 

more update pics to follow as i didnt take many 

=========================

update  night capture 




tabernackle bent 

mast block split and broken 

view from cam to the gap 






No comments:

Post a Comment