Total Pageviews

Friday 1 November 2024

Aguila boat move day

 well today the harbour mooring started 

transport was arranged back in july and was ok with guy to do

however in the last few days he never answered his phone to give me a meet time


i went up regardless as i have a nother plan, 


at the club for 9am and i made measurements of how the trailer was for lenght 

this was relayed back to Tudor and agreed it was ok to go on flatbed truck

i rerang the recovery truck still no reply


i set about finding the wiring and first off was the speed and trip log , this was easy and that led me to remove any other wiring, im not using a big 12v lead acid battery or all the connection and switches that were on the boat

most were removed wires cut back ready and anyother wiring removed

the Switch panel also removed and all nav instrument wiring tidied or removeed 

my system is to use small 12h 7ah batterys and remove them if they need full recharge 

i have a solar panel and controller that i will wire up to charge the banks 

then a few measurements of the area to be paneled for this to be all housed 

then the instruments in the cockpit all trial and error 

plenty to get on with , but better when back in aberystwyth 

hopefully sunday will be move day 

axle to stern measurement 

showing the boat on trailer

not to bad looking out the cockpit whilst removing wiring 

looking at where the panel will be 

drop keel arrangment showing the hole

as above 


towhook to axle measurement






No comments:

Post a Comment