https://svamanda.dk/anchor/advanced
i was sent the link to this to determine chain and rode length
very interesting
https://svamanda.dk/anchor/advanced
i was sent the link to this to determine chain and rode length
very interesting
a busy day as Clwb Hwylio Aberystwyth Boat Club is being formed so had to be at the boat for 1pm to meet Tom to discuss our plans.
when i arrived i couldn't open the lock despite it all spinning nice , so i had to break the lock retaining clip.
never mind a few rivits job done
task 2 was check my wood template was correct for switch box was it hell way too small
so in the end i put a piece on the side and waited for that to cure then i can fix the panel to it and custom do the rest.
then i did the rest of my blocks around the window this went better
next task was to use the 5 way wagos the way the wiring was done initially i removed alot but it all still seems long , i then tested each switch and nothing worked , so after tracing and starting again and tidying i add each circuit on separate. this worked
so now they are labelled as well, also added the led light above on the cabin roof , opposed to it being on the side , i cant move my solar controllers until the window is done
well the best time to officially launch is On the highest tide which coinincides with a few things
as long as the boat can sail and the motor works and mooring setup anything else is in material
need 4m to get it to its mooring
well the weather was forecast good again and it was, off to the boat by 0845 to watch the highest tide so far 5.61m at 0915
first job is always unload all the boxs from car, then make oxo drink
then wonder what thew hell im doing today.
plan was do the bilge pump, so it was tested and worked, then it was positioned and zipped tied in place and bigger duty cable run to cockpit , this was made off ready
next was to further tidy the electrics , this will be an ongoing process to the point its installed withing the cabin unit and switch board.
then talking of switchboard i got the one i purchased a year ago and decided how to wire it up , yes more wiring alterations
![]() |
G3 at high tide |
![]() |
on |
![]() |
off |
![]() |
new 5 swich panel trying to be installed |
![]() |
Low tide |