Total Pageviews

Saturday, 22 February 2025

22nd Feb 2025 2 days running

 well the good weather did arrive so i got on with more work on the boat 

tided the solar controller wiring and zip tied. 

swapped the lead acid 12v 35ah batt for the ecoworthy 12v 100ah lipo

removed the original solar panel of cabin roof 

removed a few loose window bolts and covered the holes with gaffa 

removed redundant wire unknown and plugged the cab in cabin roof.

tidied cabin in general. 

removed old battery connector for trolling motor prev owner used 

removed other fittings associated

undid rear nav light to check bulb , it popped out never to be seen again, but one wire was off so put back on 

checked ground chains on g3 for length to the wall 



looking at G3 the gap

overall a productive morning 
















rear nav light 
















No comments:

Post a Comment